Riviera Homes

Supply and Install contract | $1 Million

6 Storey Building

1,870 m² of Precast Transfloor

2150 m² of Precast Walls

450 precast items supplied and installed in an 8 week period

Project Challenges
  • Small site on a busy road.
  • All the precast products were to be delivered at the rear of the building in an inconvenient location.
Solutions
  • Our team designed the precast products to suit the delivery and the building constraints.
  • Precast walls were delivered via Panel Loader with palletised frames.
Client Benefits
  • Entire precast scope complete in 8 weeks.
  • Thoughtful design eliminated potential issues while we provided cost savings to the client throughout the project.